Our Remodeling Process | Step-by-Step

Whether you are remodeling a bathroom or building an addition, the process stays detailed and consistent.  While there may be a few more details with an addition, we will hold your hand every step of the way regardless of the project.

  1. Initial Consultation

    • Discuss goals, style, budget, and must-haves.

    • Walk through the existing space, take measurements and review ideas.

  2. Proposal & Contract

    • Detailed scope of work proposed for approval

    • Provide 3D Renderings for vision if needed

    • Contract Signing.

    • Timeline, payment schedule, and expectations agreed upon.

  3. Design & Planning

    • Shopping Day is scheduled!

    • Architectural Drawings if required begin developing

    • Finishes, and material selections, including cabinetry, stone, tile, plumbing and electrical fixtures – creating our own mood board throughout the shopping experience.

    • Refined material allowances based on selections and approvals.

  4. Permits & Ordering

    • Submit applications if needed (structural, plumbing, electrical).

    • Order all approved items like cabinets, windows, or fixtures, etc.

  5. Demolition & Prep

    • Remove old finishes, appliances, and non-structural elements.

    • Protect the rest of the home with dust barriers.

  6. Structural / Rough Work

    • Framing, electrical, plumbing, HVAC.

    • Inspections as required.

    • Insulation and Sheetrock and flooring/ wet space preparation

  7. Installation & Finishes

    • Cabinets, counters, flooring, tile, lighting, and trim.

    • Paint and final styling.

  8. Final Walkthrough and Project Completion

    • Punch list review.

    • Final Inspections if needed

    • Ensure quality and satisfaction before handoff.

    • Space is cleaned and ready to enjoy.

    • Pertinent warranties provided.